Jump to content

Folding@home: la Team INpact qui guérit la planète


Will.
 Share

Recommended Posts

Wow on a encore perdu 9 plieurs d'un coup...

Je crois qu'on devrait essayer de trouver le moyen de pérenniser le nombre de plieurs plutôt que d'essayer d'avoir des nouveaux, dont seulement 1 sur 10 deviendra un plieur régulier :reflechis:

Link to comment
Share on other sites

aie aie aie encore une WU plante comme l'autre fois

[06:35:16] Completed 210000 out of 1000000 steps (21)

[07:01:30] Writing local files

[07:01:30] Completed 220000 out of 1000000 steps (22)

[07:27:43] Writing local files

[07:27:43] Completed 230000 out of 1000000 steps (23)

[07:47:05] Gromacs cannot continue further.

[07:47:05] Going to send back what have done.

[07:47:05] logfile size: 23344

[07:47:05] - Writing 23880 bytes of core data to disk...

[07:47:05] ... Done.

[07:47:05]

[07:47:05] Folding@home Core Shutdown: EARLY_UNIT_END

[07:47:09] CoreStatus = 72 (114)

[07:47:09] Sending work to server

[07:47:09] + Attempting to send results

[07:47:12] + Results successfully sent

[07:47:12] Thank you for your contribution to Folding@home.

[07:47:16] - Preparing to get new work unit...

Ca fe 2 fois en 1 semaine kan meme :reflechis::merci:

Link to comment
Share on other sites

Wow on a encore perdu 9 plieurs d'un coup...

Je crois qu'on devrait essayer de trouver le moyen de pérenniser le nombre de plieurs plutôt que d'essayer d'avoir des nouveaux, dont seulement 1 sur 10 deviendra un plieur régulier :fumer:

Me k s ke c ke bordel?????

NOus avons a peine 20 plieurs dep lus ke PPC....et les points de l'equipe dites donc c po folichon un peu moins de 13000 points ca fe vraiment po serieux...

MASHALA K 4 S TU FOU????? PEDALE PLUS VITE...... tout deépnd de toi .... :reflechis::merci::fumer::fumer:

Link to comment
Share on other sites

Bon la je bosse la dessus sur mon PIII

Projects 109X are the result of a collaboration with colleagues at the University of Milan, which look at the equilibrium between multiple states in the RN24 peptide, an analog of the amino-terminal 13 of ribonuclease A. The points and deadline for these work units are 91.0 and 18 days respectively (GROMACS core). These projects are currently in beta testing only.

Donc si je pige bien je risque de planter encore comme mon message si dessus?

Link to comment
Share on other sites

Bon la je bosse la dessus sur mon PIII

Projects 109X are the result of a collaboration with colleagues at the University of Milan, which look at the equilibrium between multiple states in the RN24 peptide, an analog of the amino-terminal 13 of ribonuclease A. The points and deadline for these work units are 91.0 and 18 days respectively (GROMACS core). These projects are currently in beta testing only.

Donc si je pige bien je risque de planter encore comme mon message si dessus?

Tiens, j'ai ça en cous, ça fait 15heures que ça calcule, et ça tient pour le moment :yes:

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

×
×
  • Create New...